Crews with KS Energy are doing work on behalf of We Energies. They’re making repairs inside two of our underground electrical vaults. Crews are tuckpointing the walls inside the vaults as well as replacing the vault roofs.
The work is expected to take three to four weeks. In the meantime, Water Street is reduced to one lane in each direction between Wisconsin Avenue and Mason Street.
No comments:
Post a Comment